Move
The timing of demand can be changed with the right-click Extend and Move commands on project portfolio sheets.
|
![]() |
If the Move phase dates box is checked, the number of periods specified will be added to each of the phase dates that fall within the affected time periods.
When using Extend and Move commands, download enough time periods from the database to allow values to move later in time (i.e., to the right on the grid). If your Move or Extend request would cause demand from the last original period to occur later than the last downloaded period, the operation is not permitted.